Property: Approximately 2,500 sq ft rural single-family residential, rural Pelham NH
Owner: H.T. (property owner alias)
Scope: Aging oil boiler and window AC configuration replaced with premium Carrier Infinity Greenspeed variable-capacity heat pump; complete oil elimination including 275-gallon aboveground oil tank removal through licensed oil tank contractor with NH DES compliance; existing radiator hydronic distribution decommissioned
Timeline: Diagnostic and design 4 weeks, installation 7 days including new ductwork installation, oil tank removal 1 additional day (coordinated with licensed oil tank contractor)
Investment: $36,400 combined installation, oil tank removal, and new ductwork scope, $2,500 NH Saves heat pump rebate, $2,000 IRA 25C federal tax credit, net $31,900
H.T. owns a rural single-family residential property in a rural area of Pelham NH away from the developed subdivision corridors and Liberty Utilities gas coverage areas. H.T.’s property maintains fuel oil retention — representing another rural fuel category alongside propane retention covered in prior Pelham NH case studies. While propane represents the largest rural fuel category in Pelham NH (approximately 50-70% of properties), fuel oil retention represents a smaller but still substantial category (approximately 10-20% of Pelham NH properties — often older properties with heating configurations dating to earlier decades when oil heating was more prevalent throughout southern New Hampshire).
H.T.’s property configuration: approximately 2,500 sq ft two-story residential dating originally to approximately 1962 with subsequent renovations, on approximately 2.1 acre rural lot. Original hydronic (radiator-based) oil-fired heating configuration typical of 1960s New England residential construction — no ductwork throughout the property; single-pipe steam or hot water radiator distribution to individual rooms. Window AC units for summer months on primary rooms.
Original HVAC configuration: 22-year oil boiler serving hot water radiator distribution throughout, cast-iron radiators in each room (approximately 10 radiators throughout the property), 275-gallon aboveground oil tank in basement mechanical space (typical residential oil tank configuration for the era), oil water heater retained for hot water production (integrated with boiler through separate hot water coil), window AC units for summer months on approximately 3 primary rooms.
H.T. requested Rivic assess replacement options with priorities: (1) fossil-fuel elimination through heat pump conversion given the aging oil equipment and long-term operating cost concerns from oil price volatility, (2) complete oil elimination including aboveground oil tank removal through licensed oil tank contractor (H.T. aware of NH DES compliance requirements distinct from Massachusetts MassDEP framework), (3) coordinated cooling installation replacing window AC operation, (4) approach to existing hydronic radiator distribution — H.T. open to complete removal and replacement with ducted heat pump distribution given the coordinated fossil-fuel elimination scope.
Andrew Samples conducted the initial diagnostic assessment given his oil equipment expertise. Ryan Sullivan handled premium equipment specification for the coordinated ducted heat pump installation. Kathleen Brennan initiated licensed oil tank contractor coordination for NH DES-compliant oil tank removal scope.
Key findings: (1) 22-year oil boiler at end-of-life range with declining efficiency and reliability, (2) cast-iron radiators throughout the property are historically valuable but H.T. opted for complete removal to simplify the installation scope — alternative would have been retaining radiators with integrated hydronic distribution and hybrid heat pump + boiler configuration (see also Merrimack River corridor Dracut farmhouse steam retention case study for a comparable steam retention approach), (3) no existing ductwork requires new ductwork installation throughout the property adding substantial scope to installation, (4) 200A Eversource NH electric service adequate for heat pump installation with capacity margin, (5) 275-gallon aboveground oil tank in basement requires licensed oil tank contractor for NH DES-compliant removal, (6) oil water heater retention approach: H.T. planned coordinated heat pump water heater installation at time of oil equipment removal for complete oil elimination in single installation cycle.
ACCA Manual J load calculation determined property heating load at 4°F winter design of approximately 52,000 BTU/hr and cooling load at 88°F summer design of approximately 36,000 BTU/hr.
Oil tank removal on NH properties follows the New Hampshire Department of Environmental Services (NHDES) framework rather than the Massachusetts Department of Environmental Protection (MassDEP) framework applicable to Rivic’s MA installations. The NH DES framework is broadly similar to MassDEP scope but with specific NH-particular protocols:
H.T.’s aboveground tank removal completed with no evidence of oil leakage; standard NH DES-compliant scope without expanded remediation. Cost approximately $2,600 for the coordinated tank removal scope.
Rivic recommended premium Carrier Infinity Greenspeed variable-capacity heat pump 5-ton nominal capacity with new ductwork installation throughout the property plus coordinated Rheem ProTerra heat pump water heater 80-gallon for complete oil elimination. Combined equipment specification: (1) Carrier Infinity 25VNA0 variable-capacity outdoor unit, (2) Carrier Infinity communicating platform with 5-stage part-load modulation, (3) Carrier Infinity indoor air handler with ECM variable-speed blower, (4) Carrier Infinity Touch communicating thermostat, (5) 10-year Carrier Infinity manufacturer warranty on parts + compressor, (6) Rheem ProTerra 80-gallon hybrid heat pump water heater at 3.5-4.0 UEF, (7) 10-year Rheem tank + parts warranty on water heater scope.
New ductwork installation: new supply and return ductwork throughout the property matched to the multi-story configuration; new supply grilles and return grilles at each room; central air handler location in basement mechanical space in the location previously occupied by the oil boiler.
Existing hydronic radiator distribution decommissioning: cast-iron radiators removed from all 10 rooms; hot water piping capped and drained; hydronic distribution completely decommissioned in favor of new ducted distribution.
Oil boiler and oil water heater decommissioning: 22-year oil boiler and integrated oil water heater components removed. Oil piping capped at all connection points.
A brief editorial note on the cast-iron radiator preservation decision: this case study reflects H.T.’s decision to remove the historic cast-iron radiators as part of the coordinated fossil-fuel elimination scope. Alternative approaches for historic residential properties with intact cast-iron radiators typically favor retention:
Installation completed over 7 days for HVAC and ductwork scope plus 1 additional day for oil tank removal. Post-installation first-year operational verification: coordinated heat pump + heat pump water heater configuration delivered reliable heating and cooling with substantially improved comfort compared to previous window AC + radiator hydronic configuration. H.T. reported particular satisfaction with the coordinated modern HVAC scope replacing the aging oil equipment.
Post-installation first-year utility monitoring: total electric operating cost approximately $1,780 for combined heating, cooling, and water heating. Previous year utility costs: oil heating approximately $2,680 (22-year boiler at declining efficiency plus oil price fluctuation), oil-integrated water heating approximately $640 (included in boiler operation), electric window AC approximately $460, combined approximately $3,780/year. Annual operating cost reduction approximately $2,000/year — substantial reduction reflecting complete oil elimination benefits plus efficient coordinated heat pump + heat pump water heater scope. Oil operating cost per BTU is typically 60-100% higher than natural gas per BTU, making oil-to-heat-pump conversions typically deliver larger operating cost reductions than gas-to-heat-pump conversions.
Rural Pelham NH and other rural NH oil-to-heat-pump conversion service including complete oil elimination through heat pump installation, coordinated heat pump water heater replacement for complete fossil-fuel elimination scope, licensed oil tank contractor coordination for NH DES-compliant aboveground and underground oil tank removal, existing hydronic distribution decommissioning or hybrid heat pump primary + boiler backup approach depending on property configuration, cast-iron radiator historic preservation coordination for pre-1930 historic residential properties, new ductwork installation where required, NH regulatory framework coordination, combined NH Saves rebate coordination, IRA 25C federal tax credit coordination, and manufacturer warranty administration all route through our 225 Broadway #306 office in downtown Methuen. This case study represents a specific installation completed for H.T.; individual property assessments determine equipment specification, ductwork approach, tank scope, and installation configuration.