Property: Approximately 2,600 sq ft rural single-family residential, western Dracut adjacent Pelham NH border
Owner: K.D. (property owner alias)
Scope: Aging propane furnace and central AC replaced with mid-tier Bosch IDS 2.0 variable-capacity heat pump; complete propane elimination including underground propane tank decommissioning; 500-gallon propane tank scope handled through licensed propane contractor coordination
Timeline: Diagnostic and design 3 weeks, installation 5 days, propane tank decommissioning 1 additional day (coordinated with licensed propane contractor)
Investment: $27,200 combined installation and propane tank scope, $10,000 Mass Save Whole-Home Heat Pump rebate (propane conversion qualifying), $2,000 IRA 25C federal tax credit, net $15,200
K.D. owns a rural single-family residential property in western Dracut adjacent to the Pelham NH border. Western Dracut’s border area with Pelham NH includes several properties on propane (rather than natural gas) reflecting the historical pattern where natural gas distribution infrastructure did not extend to the more rural western Dracut properties, and where Pelham NH’s substantial propane retention pattern extends across the border into adjacent Dracut rural areas.
K.D.’s property has approximately 2,600 sq ft two-story configuration with 1988 subdivision construction on a larger rural-suburban lot. Existing HVAC configuration: 18-year current propane furnace (replaced approximately 18 years ago; original 1988 furnace replaced earlier), matching central AC installed approximately 18 years ago, 500-gallon underground propane tank in side-yard buried at approximately 4-foot depth per typical residential installation, propane water heater in basement mechanical space (K.D. plans separate replacement in future upgrade cycle), forced-air ducted distribution throughout.
K.D. has been considering coordinated propane-to-heat-pump conversion for approximately 2 years driven by propane operating cost trajectory (propane prices during 2022-2024 heating seasons ranged $2.80-$4.60 per gallon delivered, with substantial year-over-year and even month-over-month variation), reliability concerns with the 18-year propane furnace, and interest in fossil-fuel elimination for both environmental and operating cost stability reasons.
K.D. requested Rivic assess replacement options with priorities: (1) complete propane elimination including underground tank decommissioning to reduce ongoing propane operating cost and tank maintenance liability, (2) Mass Save Whole-Home Heat Pump rebate qualification (propane-to-heat-pump conversion qualifies for Whole-Home rebate scope), (3) fossil-fuel elimination given long-term propane cost trajectory concerns, (4) mid-tier equipment specification matching K.D.’s budget priorities.
Andrew Samples conducted the initial diagnostic assessment. Key findings: (1) 18-year propane furnace with declining efficiency (approximately 74-80% effective from 82% AFUE nameplate), heat exchanger inspection showed corrosion but no cracks yet, (2) 18-year central AC with refrigerant charge decline (approximately 15-25% below design), (3) existing ductwork in acceptable condition suitable for heat pump conversion, (4) 200A electric service adequate for heat pump installation with capacity margin, (5) 500-gallon underground propane tank buried at 4-foot depth in side-yard — requires licensed propane contractor for decommissioning per applicable regulations, (6) propane supplier customer relationship: K.D.’s propane supplier (verified as one of the common Merrimack Valley propane suppliers) requires standard supplier notification for account closure and tank removal coordination.
ACCA Manual J load calculation determined property heating load at 4°F winter design of approximately 58,000 BTU/hr and cooling load at 88°F summer design of approximately 38,000 BTU/hr.
Rivic recommended Bosch IDS 2.0 mid-tier variable-capacity heat pump 4-ton nominal capacity with existing ductwork utilization matched to K.D.’s budget priorities. Equipment specification: (1) Bosch IDS 2.0 inverter-driven variable-capacity outdoor unit, (2) Bosch matched indoor air handler with variable-speed ECM blower, (3) Bosch standard programmable thermostat, (4) 5-year Bosch parts warranty + 10-year compressor warranty.
Existing ductwork utilization: minor duct sealing improvements at accessible joints; supply and return grille inspection confirmed adequate condition; variable-speed ECM blower matched to Bosch IDS 2.0 variable-capacity operation.
Propane furnace and central AC decommissioning: 18-year propane furnace and central AC removed with proper refrigerant recovery per EPA Section 608; propane piping capped at previous furnace location; remaining propane in furnace supply line properly handled per licensed propane contractor coordination.
Kathleen Brennan coordinated the underground propane tank decommissioning scope with a licensed propane contractor. The propane tank decommissioning scope typically requires specific licensed handling that HVAC contractors do not directly perform — comparable to Rivic’s approach with oil tank removal scope (licensed oil tank contractor subcontracted for oil tank removal on oil-to-heat-pump conversions).
Underground propane tank decommissioning scope:
K.D. selected complete tank removal ($3,600 in this case) for future property flexibility and elimination of the tank as a property feature.
An important operational note for propane-served properties: propane emergency response differs from natural gas emergency response in significant ways:
Installation completed over 5 days for HVAC scope plus 1 additional day for propane tank decommissioning (coordinated with licensed propane contractor). Post-installation first-year operational verification: heat pump operated reliably through the first winter including cold-snap periods with outdoor temperatures reaching 3°F to 6°F range. Bosch IDS 2.0 inverter-driven variable-capacity operation delivered efficient part-load performance.
Post-installation first-year utility monitoring: total electric operating cost approximately $1,540 for combined heating and cooling. Previous year utility costs: propane heating approximately $2,180 (varying with propane price fluctuation; some months substantially higher during peak demand), electric cooling approximately $580, combined approximately $2,760/year. Annual operating cost reduction approximately $1,220/year — larger reduction than typical gas-to-heat-pump conversions reflecting propane’s higher cost per BTU compared to natural gas.
Western Dracut and Pelham NH border propane-to-heat-pump conversion service including complete propane elimination through heat pump installation, licensed propane contractor coordination for underground and aboveground propane tank decommissioning (removal or in-place decommissioning options), Mass Save Whole-Home Heat Pump rebate coordination for propane conversion scope, IRA 25C federal tax credit coordination, and simplified emergency response scope post-conversion all route through our 225 Broadway #306 office in downtown Methuen. This case study represents a specific installation completed for K.D.; individual property assessments determine equipment specification, tank decommissioning options, and installation scope.