Property: Approximately 2,300 sq ft rural single-family residential, Route 38 corridor Pelham NH
Owner: T.M. (property owner alias)
Scope: Aging propane furnace and central AC replaced with mid-tier Bosch IDS 2.0 variable-capacity heat pump using existing ductwork; complete propane elimination including 500-gallon aboveground propane tank decommissioning; NH regulatory framework applied to rural Pelham NH propane conversion
Timeline: Diagnostic and design 3 weeks, installation 5 days, propane tank decommissioning 1 additional day (coordinated with licensed propane contractor)
Investment: $23,800 combined installation and propane tank scope, $2,000 NH Saves heat pump rebate, $2,000 IRA 25C federal tax credit, net $19,800
T.M. owns a rural single-family residential property along the Route 38 corridor in Pelham NH. Route 38 is Pelham NH’s primary north-south route through the town connecting to Salem NH to the north and Massachusetts (Dracut and Lowell area) to the south. The Route 38 corridor hosts diverse residential development from mid-20th century subdivisions through more recent contemporary construction, with the substantial Pelham NH propane retention pattern typical throughout.
Pelham NH propane retention context is a defining characteristic of the town’s HVAC scope. Approximately 50-70% of Pelham NH properties operate on propane heating (aboveground or underground tanks) or fuel oil heating rather than Liberty Utilities natural gas — substantially higher propane retention than rural Salem NH (15-25% typical) and reflecting Pelham NH’s more consistently rural residential character throughout the town. Liberty Utilities gas coverage in Pelham NH is limited primarily to the more developed areas near Route 38 and other primary roads; substantial portions of the town’s residential properties remain on propane retention.
T.M.’s property configuration: approximately 2,300 sq ft two-story residential on approximately 1.8 acre rural lot, forced-air propane furnace serving ducted distribution throughout, matching central AC installed with the propane furnace approximately 17 years ago, 500-gallon aboveground propane tank in side-yard (aboveground rather than underground per T.M.’s preference at time of previous installation), propane water heater in basement mechanical space (T.M. planning coordinated heat pump water heater replacement for complete propane elimination at time of current installation).
T.M. requested Rivic assess replacement options with priorities: (1) complete propane elimination through both heat pump installation and coordinated heat pump water heater replacement for full fossil-fuel elimination scope, (2) aboveground propane tank complete decommissioning coordinated with licensed propane contractor, (3) NH Saves rebate coordination including both heat pump rebate and heat pump water heater rebate as separate qualifying scope, (4) mid-tier equipment specification matching rural Pelham NH residential market context.
T.M.’s installation scope includes coordinated heat pump and heat pump water heater installation for complete propane elimination on the property. This approach differs from the rural Salem NH case study (partial propane retention with future coordinated water heater replacement) and represents a more complete NH conversion scope suitable for property owners ready to eliminate propane entirely in a single installation cycle:
Correction to investment summary: including heat pump water heater scope adds approximately $2,800 to the base heat pump installation cost (Rheem ProTerra 80-gallon equipment plus installation labor). Total revised installation cost approximately $26,600 combined including heat pump water heater. Additional NH Saves rebate approximately $800 for heat pump water heater scope. Revised net investment approximately $21,800 after combined rebates.
The below investment summary is corrected accordingly to reflect the actual coordinated scope.
Andrew Samples conducted the initial diagnostic assessment. Kathleen Brennan coordinated licensed propane contractor for aboveground tank decommissioning scope and NH Saves rebate coordination for combined heat pump + heat pump water heater rebate scope.
Key findings: (1) 17-year propane furnace with declining efficiency at end-of-life range, (2) 17-year central AC with declining efficiency and typical refrigerant charge decline, (3) 15-year propane water heater at end-of-life range appropriate for coordinated replacement, (4) existing ductwork acceptable for heat pump conversion with minor sealing improvements, (5) 200A Eversource NH electric service adequate for both heat pump and heat pump water heater installation, (6) basement configuration suitable for heat pump water heater installation with adequate ambient air volume for heat extraction, (7) 500-gallon aboveground propane tank decommissioning through licensed propane contractor with tank pickup and removal (simpler and less expensive than underground scope).
ACCA Manual J load calculation determined property heating load at 4°F winter design of approximately 46,000 BTU/hr and cooling load at 88°F summer design of approximately 32,000 BTU/hr.
Rivic recommended Bosch IDS 2.0 mid-tier variable-capacity heat pump 4-ton nominal capacity with existing ductwork utilization plus Rheem ProTerra heat pump water heater 80-gallon capacity. Combined equipment specification: (1) Bosch IDS 2.0 inverter-driven variable-capacity outdoor unit, (2) Bosch matched indoor air handler with variable-speed ECM blower, (3) Bosch standard programmable thermostat, (4) 5-year Bosch parts warranty + 10-year compressor warranty on heat pump scope, (5) Rheem ProTerra 80-gallon hybrid heat pump water heater with 3.5-4.0 UEF efficiency, (6) 10-year Rheem tank warranty + 10-year parts warranty on heat pump water heater scope.
Existing ductwork utilization: minor duct sealing improvements at accessible joints; supply and return grille inspection confirmed adequate condition.
Complete propane elimination: 17-year propane furnace, 17-year central AC, and 15-year propane water heater all decommissioned with proper procedures. Propane piping capped at all previous connection points.
Aboveground propane tank decommissioning through licensed propane contractor coordinated by Kathleen Brennan. 500-gallon aboveground tank pickup and removal $1,800 scope (aboveground substantially simpler and less expensive than underground scope described in Western Dracut Pelham NH border case study and Beaver Lake Pelham NH case study). Propane supplier account closure coordinated through the licensed propane contractor.
Installation completed over 5 days for HVAC scope plus 1 additional day for propane tank decommissioning. Post-installation first-year operational verification: heat pump and heat pump water heater both operated reliably. T.M. reported strong satisfaction with the complete propane elimination and coordinated modern HVAC scope.
Post-installation first-year utility monitoring: total electric operating cost approximately $1,660 for combined heating, cooling, and water heating. Previous year utility costs: propane heating approximately $1,880 (17-year furnace), propane water heating approximately $580, electric cooling approximately $540, combined approximately $3,000/year. Annual operating cost reduction approximately $1,340/year — substantial reduction reflecting complete propane elimination benefits including the coordinated heat pump water heater scope.
Route 38 corridor and other Pelham NH rural residential HVAC service including complete or partial propane-to-heat-pump conversion, coordinated heat pump water heater replacement for complete propane elimination scope, licensed propane contractor coordination for aboveground and underground propane tank decommissioning, NH regulatory framework coordination (NFPA 54 base with NH-specific amendments), combined NH Saves rebate coordination for heat pump + heat pump water heater installations, IRA 25C federal tax credit coordination for combined qualifying scope, and manufacturer warranty administration all route through our 225 Broadway #306 office in downtown Methuen. This case study represents a specific installation completed for T.M.; individual property assessments determine equipment specification and installation scope.