Property: 1964 residential single-family, Policy Street area Salem NH
Owner: D.H. (property owner alias)
Scope: Aging gas furnace and central AC replaced with mid-tier Bosch IDS 2.0 variable-capacity heat pump using existing ductwork; complete fossil-fuel elimination through Liberty Utilities gas service disconnection coordination
Timeline: Diagnostic and design 2 weeks (including Liberty Utilities disconnection coordination), installation 4 days
Investment: $23,800 installed, $2,000 NH Saves heat pump rebate, $2,000 IRA 25C federal tax credit, net $19,800
D.H. owns a 1964 residential single-family property in the Policy Street area of Salem NH. Policy Street and the broader surrounding neighborhood represent Salem NH’s substantial 1960s subdivision expansion — Salem NH transformed from a smaller rural town into a substantial suburban community during the 1960s-70s expansion driven by I-93 highway completion and southern New Hampshire’s proximity to the greater Boston metropolitan area.
Policy Street area 1960s subdivision development pattern includes typical 1,600-2,400 sq ft single-family residential properties on 0.25-0.5 acre lots, standard-height ceilings (approximately 8 feet), typical 1960s construction with subsequent renovations across the decades, and forced-air heating configuration.
D.H.’s property configuration: approximately 2,000 sq ft two-story residential, forced-air gas furnace replaced approximately 19 years ago serving ducted distribution throughout, matching central AC installed approximately 19 years ago, Liberty Utilities gas service, Eversource NH electric service, gas water heater in basement (retained for future replacement).
D.H. requested Rivic assess replacement options with priorities: (1) coordinated replacement of the aging 19-year gas furnace and central AC given both approaching end-of-life range, (2) fossil-fuel elimination through heat pump conversion for NH Saves rebate opportunity (D.H. aware NH Saves rebate is substantially smaller than Mass Save but still relevant for reducing net investment), (3) mid-tier equipment specification matching D.H.’s budget priorities and Policy Street area market context, (4) Liberty Utilities gas service disconnection coordination for complete fossil-fuel elimination.
Marcus Devlin conducted the initial diagnostic assessment given his gas equipment expertise relevant to the Liberty Utilities gas service disconnection coordination scope. Kathleen Brennan initiated Liberty Utilities disconnection coordination in parallel.
Key findings: (1) 19-year gas furnace with declining efficiency (approximately 76-82% effective from 90% AFUE nameplate), heat exchanger inspection showed corrosion but no cracks yet, (2) 19-year central AC with typical refrigerant charge decline for equipment age, (3) existing ductwork from 19-year installation scope in acceptable condition suitable for heat pump conversion, (4) 200A Eversource NH electric service adequate for heat pump installation with capacity margin, (5) Liberty Utilities gas service disconnection scope: gas water heater retained requires continued Liberty Utilities gas service (D.H. plans separate replacement in future upgrade cycle, at which point complete Liberty Utilities disconnection would apply); current installation scope maintains reduced-demand Liberty Utilities service for water heater only.
ACCA Manual J load calculation determined property heating load at 4°F winter design of approximately 46,000 BTU/hr and cooling load at 88°F summer design of approximately 32,000 BTU/hr.
Rivic recommended Bosch IDS 2.0 mid-tier variable-capacity heat pump 4-ton nominal capacity with existing ductwork utilization matched to D.H.’s budget priorities. Equipment specification: (1) Bosch IDS 2.0 inverter-driven variable-capacity outdoor unit, (2) Bosch matched indoor air handler with variable-speed ECM blower, (3) Bosch standard programmable thermostat, (4) 5-year Bosch parts warranty + 10-year compressor warranty.
Existing ductwork utilization: minor duct sealing improvements at accessible joints; supply and return grille inspection confirmed adequate condition from the 19-year installation scope.
Gas furnace decommissioning: 19-year furnace removed with proper procedures; gas piping capped at previous furnace location. Liberty Utilities meter and service line retained for water heater; D.H.’s future water heater replacement (planned for 2-3 years out based on current water heater condition) will trigger complete Liberty Utilities service disconnection at that time.
Marcus’s MA Journeyman Gas Fitter licensure appropriate for the gas furnace decommissioning even though the property is in NH (NH does not have state gas fitter licensure requirement; MA licensure is accepted for NH installations under Rivic’s cross-state operations).
Liberty Utilities coordination scope for D.H.’s installation:
Installation completed over 4 days including outdoor Bosch IDS 2.0 placement, indoor Bosch air handler installation, ductwork sealing improvements, refrigerant charging, commissioning, and thermostat programming coordination with D.H. Post-installation first-year operational verification: heat pump operated reliably through the first winter including cold-snap periods with outdoor temperatures reaching 4°F to 8°F range typical of Salem NH climate. Bosch IDS 2.0 inverter-driven variable-capacity operation delivered efficient part-load performance.
Post-installation first-year utility monitoring: total electric operating cost approximately $1,340 for combined heating and cooling. Previous year utility costs: gas heating approximately $1,320 (19-year furnace declined efficiency), electric cooling approximately $560 (19-year AC declining efficiency), combined approximately $1,880/year. Annual operating cost reduction approximately $540/year — modest reduction reflecting D.H.’s smaller property scope and the mid-tier equipment selection (premium equipment would deliver slightly larger operating cost reduction but at higher initial investment).
Policy Street area and other Salem NH 1960s-70s subdivision heat pump conversion service including 20+ year gas furnace and central AC replacement with mid-tier or premium cold-climate variable-capacity heat pump, existing ductwork utilization with ECM blower upgrade, Liberty Utilities gas service coordination (complete disconnection for full fossil-fuel elimination or partial retention for retained gas appliances), NH Saves rebate coordination, IRA 25C federal tax credit coordination, and manufacturer warranty administration all route through our 225 Broadway #306 office in downtown Methuen (8-20 minute drive to Salem NH from Broadway). This case study represents a specific installation completed for D.H.; individual property assessments determine equipment specification and installation scope.